Skip to content
Back to Resources
Free Forms and TemplatesShop Operations

Semi Truck PM Checklist: Free Printable PDF to Take to the Truck

MetaFleet Team
Page one of the printable: Free Semi Truck PM Checklist (Printable), on a dark background

A free printable PM checklist form for semi trucks, one page to carry to the truck, with sections for the engine, driveline, brakes, steering, tires and electrical, and room to record readings and set the next due date.

A semi truck PM checklist lists the service tasks for each PM level and gives a place to mark OK, fix or done, record readings and set the next due date. This free printable covers the engine, driveline, brakes, steering, tires, electrical and a road test. Match the intervals to the maker's schedule.

A semi truck PM checklist is the sheet a tech works down during a preventive maintenance visit. It lists the tasks, gets each one marked, and holds the readings and the next due date. The free printable below fits one page and covers the whole truck.

This page is for shop foremen, techs and fleet maintenance leads. It does not explain what PM A, B and C mean or how to set intervals. The guide to PM A, B and C for a semi truck owns that. This page is the form you carry out to the truck.

Free printable PDF

Semi Truck PM Checklist

A one-page checklist for PM A, B and C on a semi truck: engine, driveline, brakes, steering, tires, electrical and a road test, with room for readings and the next due date.

No spam. Just the occasional guide for repair shops and fleets.

What is on the checklist

SectionWhat the tech checks
EngineOil and filter, fuel filters, air filter, coolant, belts and hoses, leaks, fault codes, DEF
Aftertreatment and exhaustMounts and clamps, leaks, status and regen history
DrivelineTransmission and axle oil, U-joints, slip yoke, clutch free play
Brakes and air systemDrain the tanks, measure pushrod stroke and lining thickness, check lines, drums, low pressure warning and ABS lamp
Steering and suspensionLinkage, kingpins, fifth wheel, springs, air bags, torque rods, shocks
Tires and wheelsPressure and tread depth at every position, wheel fasteners, hub seals, spare
Electrical, lights and cabBatteries, lights, trailer plug, horn, wipers, mirrors, heater, A/C, emergency equipment
FinishRoad test, leak check after the run, next PM due

How to use it on a PM visit

Fill in the unit, the odometer and the engine hours first, and tick the PM level. Then go section by section. Mark OK when it is fine, Fix when it needs work and write what and where in Notes, and Done when you did the service. The Level column shows which PM a task belongs to for this fleet, because one fleet's PM B is another's PM C. Record the pushrod stroke, lining thickness and tread depth as numbers, not ticks, so the next tech can see the trend.

Set the next due miles, hours and date before the truck leaves. Without a next due date the PM gets missed. To track due dates across a whole fleet, see the fleet maintenance spreadsheet.

The maker's schedule rules

This checklist is a starting point. Engine, transmission, axle and aftertreatment makers publish their own service intervals and fluid specs. Check each task against their manuals for the trucks you service, and change the form to match what the fleet signed off on. Federal rules (see 49 CFR Part 396 explained for repair shops) require motor carriers to inspect, repair and maintain their trucks on a system and keep records, and leave the schedule to the carrier. Your state or your customer may ask for more.

PM checklist mistakes

  • A tick with no reading, so brake and tire wear cannot be tracked.
  • One checklist for every truck, with no changes for the engine or duty cycle.
  • No road test, so a loose part or a leak is found by the driver.
  • A PM done and not recorded against the truck.
  • No next due date.

Where MetaFleet fits

MetaFleet runs digital inspections on your shop's own forms, with PM programs and reminders. See inspections and preventive maintenance for diesel shops.

Sources (1)

Rule text checked against the eCFR on November 22, 2026 (eCFR current through November 19, 2026).

FAQs

The engine, aftertreatment and exhaust, driveline, brakes and air system, steering and suspension, tires and wheels, electrical, lights and cab, and a road test. Add a place for readings and the next due date.
OK means the item is fine. Fix means it needs work, and you write what and where in Notes. Done means you performed the service, such as changing a filter.
Write the PM level the task belongs to for this fleet, such as A, B or C. Each fleet decides what is in each level, so fill it in from the fleet's own schedule.
Yes. Take off what does not apply and add what the engine, transmission and axle makers call for. Keep the changed version with the fleet's file.
Keep it with the unit's maintenance records. Federal rules require a motor carrier to keep records of inspection, repair and maintenance for each vehicle it controls, and customers may ask for more.

Ready to see every truck's next PM without a spreadsheet?

See MetaFleet in Action

Book a demo and we'll walk through how you schedule and track PM today, show you where MetaFleet fits, and build a simple rollout plan your team can follow.

Not ready to talk? Try a free shop tool

Related Articles